Kuya Silver Announces Letter of Intent to Acquire Camila Plant, Marking Critical Step in Vertical Integration of Silver Production in Peru | INN (opens in a new tab)
Kuya Silver advances the process to buy the same plant currently processing Bethania material, conditional on final due diligence All references to dollar amounts are references to U.S. Dollars, unless otherwise stated Kuya Silver Corporation (CSE: KUYA) (OTCQB: KUYAF) (FSE: 6MR1) ("Kuya" or the "Company") is pleased to announce it has signed a Letter of Intent ("LOI") to acquire 100% of Sociedad Minera de Responsabilidad Limitada Camila 2008 ("SMRL Camila"), the owner of the permitted Planta de Procesos Camila ("Camila Plant") the conventional floatation plant that is currently processing Kuya Silver's mineralized material to produce silver and other metal concentrates on a toll-milling basis. The plant is currently operating at 150 metric tonnes-per-day ("tpd") with plans to increase production capacity to 300 to 350 tpd, which Kuya Silver expects to undertake after closing the acquisition.