Vertiv, GreenScale to deploy DC platforms across Europe
Author: Joe Peck
Vertiv, a global provider of critical digital infrastructure, and GreenScale, a developer of hyperscale data centre campuses, have announced a strategic collaboration to deliver factory-integrated data centre platforms engineered for next-generation AI workloads in Europe.
Following a competitive pre-qualification questionnaire (PQQ) process, GreenScale selected Vertiv as its preferred provider for standardised, prefabricated Vertiv OneCore hybrid-built data centres.
15-year 245 MW IT lease valued at $7.0 billion over the base term and up to $17.7 billion if all renewal options are exercised
Google providing a financial backstop covering obligations for the 15-year base lease term
Hut 8 to implement an institutional-grade execution model designed to de-risk project delivery with blue-chip counterparties—Entergy (NYSE: ETR), J.P. Morgan (NYSE: JPM), Goldman Sachs (NYSE: GS), Vertiv (NYSE: VRT), and Jacobs (NYSE: J)
Hut 8 Corp. (Nasdaq: HUT) (TSX: HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases, today announced that it has signed a 15-year, $7.0 billion lease (the "Agreement") with Fluidstack for 245 megawatts (MW) of IT capacity at its River Bend data center campus in Louisiana (the "Transaction").
In a strategic alliance announced on Wednesday, IIT Bombay has partnered with digital infrastructure firm Vertiv to pioneer advanced cooling technologies tailored for AI-driven data centers.
This initiative is crucial as 54% of Indian businesses now deploy AI, pushing GPU power demands from 700W in 2022 to a projected 1,200W by 2025.
The collaboration targets evolving thermal needs to ensure robust and future-ready solutions.
With Vertiv's industry experience and IIT Bombay's academic insights, the aim is to transform lab research into applicable industrial solutions, simultaneously enhancing the skills of the next generation of engineers.
15-year 245 MW IT lease valued at $7.0 billion over the base term and up to $17.7 billion if all renewal options are exercised
Google providing a financial backstop covering obligations for the 15-year base lease term
Hut 8 to implement an institutional-grade execution model designed to de-risk project delivery with blue-chip counterparties-Entergy (NYSE: ETR), J.P. Morgan (NYSE: JPM), Goldman Sachs (NYSE: GS), Vertiv (NYSE: VRT), and Jacobs (NYSE: J)
MIAMI, Dec. 17, 2025 /PRNewswire/ -- Hut 8 Corp. (Nasdaq: HUT) (TSX: HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases, today announced that it has signed a 15-year, $7.0 billion lease (the "Agreement") with Fluidstack for 245 megawatts (MW) of IT capacity at its River Bend data center campus in Louisiana (the "Transaction").
Mumbai, Dec 17 (PTI) IIT-Bombay on Wednesday said it has joined hands with digital infrastructure solutions provider Vertiv to develop advanced cooling solutions for AI-driven data centres.
With 54 per cent of Indian businesses already adopting AI in some form and GPU (Graphics Processing Unit) power consumption rising sharply from 700W in 2022 to an expected 1,200W in 2025, the pressure on data-centre cooling systems has increased.
This partnership aims to build solutions that address these fast-evolving thermal demands while creating a pipeline of industry-ready engineering talent, according to a statement.
"Our collaboration with Vertiv enables us to take research from labs to solutions with direct industrial relevance. As AI and high-performance computing systems evolve, there is a pressing need for approaches that are both technically robust and future-ready.... When industry brings real-world experience, and academia brings fearless curiosity, the result is always greater than the sum of its parts," Indian Institute of Technology Bombay (IIT Bombay) director Shireesh Kedare said.
15-year 245 MW IT lease valued at $7.0 billion over the base term and up to $17.7 billion if all renewal options are exercised
Google providing a financial backstop covering obligations for the 15-year base lease term
Hut 8 to implement an institutional-grade execution model designed to de-risk project delivery with blue-chip counterparties—Entergy (NYSE: ETR), J.P. Morgan (NYSE: JPM), Goldman Sachs (NYSE: GS), Vertiv (NYSE: VRT), and Jacobs (NYSE: J)
MIAMI, Dec. 17, 2025 /PRNewswire/ -- Hut 8 Corp. (Nasdaq: HUT) (TSX: HUT) ("Hut 8" or the "Company"), an energy infrastructure platform integrating power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases, today announced that it has signed a 15-year, $7.0 billion lease (the "Agreement") with Fluidstack for 245 megawatts (MW) of IT capacity at its River Bend data center campus in Louisiana (the "Transaction").