KLIA Aerotrain service resumes after pump failure during heavy rain (opens in a new tab)
SEPANG: The KLIA Aerotrain service at Terminal 1 of Kuala Lumpur International Airport (KLIA1) experienced a temporary suspension earlier today following heavy rainfall that caused water accumulation in the tunnel. Malaysia Airports confirmed the disruption occurred at 11 am due to a technical fault in one of the drainage pumps. The airport operator stated that the tunnel’s drainage system is designed to handle water ingress during severe weather, but a malfunction prevented automatic water removal. “As a safety precaution, train operations were suspended until the water was manually cleared and the tracks were confirmed safe for use,“ Malaysia Airports said in a statement.