The company has an installed module manufacturing capacity of 6.00 GW as of March 31, 2025.
Rayzon Solar is targeting the next phase of its growth by expanding into
.
IPO details
Rayzon Solar files DRHP with Sebi for ₹1,500 crore IPO; check key details
Rayzon Solar files DRHP with Sebi for ₹1,500 crore IPO; check key details
Rayzon Solar aims to raise ₹1,500 crore through its maiden public issue comprising entire fresh issue and no offer for sale
Upcoming IPO: Gujarat-based Rayzon Solar, a solar photovoltaic module manufacturer, has filed its draft red herring prospectus (DRHP) with the Securities and Exchange Board of India (SEBI) for its maiden public issue.
Gujarat-based Rayzon Solar, a leading manufacturer of solar photovoltaic modules in India, has filed its draft red herring prospectus (DRHP) with the Securities and Exchange Board of India (SEBI) for an initial public offering (IPO).
The offering, with a face value of Rs 2 per share, is entirely a fresh issue targeting to raise up to Rs 1,500 crore, with no offer for sale component included.
Additionally, the IPO includes a reserved subscription portion for eligible employees at a discounted rate.
The proceeds from the IPO are earmarked primarily for investment in its wholly-owned subsidiary, Rayzon Energy Private Limited (REPL).
Rayzon Solar, a leading solar photovoltaic module manufacturer based in Gujarat, has taken a significant step towards expansion by filing a draft paper with the Securities and Exchange Board of India (Sebi) to initiate a Rs 1,500 crore Initial Public Offering (IPO).
The upcoming IPO is purely a fresh issue without any offer for sale component.
Additionally, there is a reserved portion for employees with a subscription discount, as stated in the draft red herring prospectus.
In anticipation of the IPO, the company plans to raise about Rs 300 crore through a pre-IPO round, potentially impacting the fresh issue size.
Upcoming IPO: Gujarat-based Rayzon Solar Ltd has filed its draft red herring prospectus (DRHP) with the capital market regulator, Securities and Exchange Board of India (SEBI), for an initial public offering (IPO).
Rayzon Solar began its journey in 2017 as a partnership entity known as M/s Rayzon Green Energies, specializing in the production of solar PV modules, and has swiftly increased its manufacturing capacity for solar PV modules from just 40 MW as of March 31, 2018, to 6.00 GW as of March 31, 2025.
It produces solar PV modules at two manufacturing sites situated in Karanj and Sava, currently possessing a manufacturing capacity of 3.00 GW at each location and planning to enhance its manufacturing capability by an additional 2.00 GW at the Sava facility, which is set to be operational by October 2025.
Through its subsidiary, Rayzon Energy Private Limited, the company is working on establishing a 3.50 GW solar cell manufacturing facility in Kathvada in Mangrol, utilizing tunnel oxide passivated contact (TOPCon) technology, anticipated to start operations in Fiscal 2027.
Rayzon Solar co-founders and MDs Chirag Nakrani and Hardik Kothya | Credit: Rayzon Solar
Surat, Gujarat-based solar photovoltaic module maker Rayzon Solar Ltd has filed draft papers with the Securities and Exchange Board of India (SEBI) to raise Rs 1,500 crore ($175 million) via an initial public offering.
The IPO comprises only a fresh issue of shares and existing shareholders don’t intend to sell any stake, according to the draft red herring prospectus.
Rayzon, which has an installed capacity of 6GW, may also raise up to Rs 300 crore in a pre-IPO round.