Hyderabad: The Greater Hyderabad Municipal Corporation (GHMC) has intensified its efforts to ensure food safety by conducting surprise inspections at 90 bakeries across the city this week.
The operation, spearheaded by GHMC’s Food Safety Wing, aims to promote hygiene and enforce compliance with the Food Safety and Standards Act, 2006.
80 Food Samples Sent for Laboratory Testing
As part of the drive, officials collected 80 surveillance samples, which have been sent to the State Food Laboratory in Nacharam for analysis.
In a low-profile launch at BSNL’s Ameerepet Exchange in Hyderabad, India took a confident step toward redefining the future of broadband.
The state-run telecom major, Bharat Sanchar Nigam Limited (BSNL), unveiled Quantum 5G Fixed Wireless Access (FWA) a 100% indigenous, SIM-less, fiber-grade internet solution delivered over 5G radio.
This isn't just another product launch.
It’s a technological milestone that positions India as a credible innovator in the global telecom race and underscores the growing confidence of its engineering ecosystem.
LinkedIn’s India Hiring ROI research, based on responses from over 1,300 HR professionals across 10 cities, finds that recruiters in Hyderabad are shifting from ‘quick hiring’ to ‘quality hiring’, with quality of hire (79%) emerging as the top measure of success, followed by time to hire (61%) and retention rate (60%).
The definition of ‘quality talent’ is shifting – 74% recruiters in the city prioritise practical and transferable skills when defining talent quality.
Ruchee Anand, Head of LinkedIn Talent Solutions in India, says, “Recruiters across India are shifting focus from just filling roles to finding quality talent that drives business impact. Hyderabad is championing this evolution with investments in AI-powered tools to help them hire better. At this crucial juncture, 8 in 10 recruiters in the city are also seeing value in online platforms such as LinkedIn to deliver the highest recruitment ROI. As hiring grows more skills-first and strategic, LinkedIn’s AI-powered tools are helping talent leaders unlock stronger candidate engagement and build an agile workforce.”
Talent gaps key challenge across sectors
CREDAI-HYD New Managing Panel Announced
Hyderabad:Credai-Hyderabad on Friiday announced its new managing committee for 2025-27 term, with N. Jaideep Reddy as its president and B. Jagannath Rao as president-elect.
Manoj Kumar Agarwal, Kurra Srinath, K. Anil Reddy, and Y. Ravi Prasad are the new vice-presidents, according to a statement.
Credai-Hyderabad also named its first woman elected as EC member, Kavya Kavuri.
Kranti Kiran Reddy K. will serve as general secretary, Nitish Reddy Gudoor as treasurer and Sanjay Kumar Bansal and Sriram Musunuru as joint secretaries.
Hyderabad: What happens when AI isn’t just answering prompts, but making decisions, completing tasks, and acting independently?
At St Francis College for Women, students from across Hyderabad got hands-on with agentic AI, a model that shifts AI from passive automation to intelligent, goal-driven systems that can perform complex functions like drafting job applications, responding to emails, summarising news, or conducting research.
“This isn’t just about technology, it’s about choices, who builds it, how it’s used, and what values are embedded in it,” said Melissa Nandula, American Spaces Programming Coordinator at Hyderabad.
“Agentic AI is going to shape how people work, communicate, and solve problems. But that means we also have to ask tough questions about trust, responsibility, and ethics.”
Hyderabad The Telangana government has submitted the proposal of Hyderabad Metro Rail Phase 2 (B), along with all the required documents and Detailed Project Reports (DPR) to the Centre on Saturday, June 21.
The phase 2 (B) of the project consists of 3 corridors – Hyderabad Airport to the Future City stretching 39.6 km and costing Rs 7,168 crore; Jubilee Bus Station to Medchal with a distance of 24.5 km amounting to Rs 6,946 crore; and Jubilee Bus Station to Shamirpet stretching 22km at a cost of Rs 5,465 crore.
The total cost of the phase 2 (B) of the project covering a metro rail network length of 86.1 km is Rs 19,579 crore.
Like the earlier submitted Phase 2 (A) of the project with 5 corridors covering a length of 76.4 km, the Phase 2 (B) is also proposed to be developed as a joint venture project between the state government and the Centre.