Power begins to return after huge outage hits Spain and Portugal
World
Power begins to return after huge outage hits Spain and Portugal
Spain's Interior Ministry declared a national emergency
Companies to build pre-processing facility in northern France to extract ‘black mass.’
Construction to begin in 2026; operations to commence in 2027
LG Energy Solution marks a critical first step toward a closed-loop system in Europe to strengthen value chain competitiveness.
SEOUL, South Korea, April 29, 2025 /PRNewswire/ — LG Energy Solution has announced plans to establish a joint venture with Derichebourg, the French leader in metal waste recycling, to build a state-of-the-art battery recycling plant.
(
- GlobeNewsWire - Nasdaq)
Europe's only provider of more powerful, energy-efficient and cost-effective AI Chips than other solutions from global market leaders Funding will enable VSORA to produce its cutting-edge AI chip in 2025
Funding will enable VSORA to produce its cutting-edge AI chip in 2025
Highco: Q1 2025 GROSS PROFIT
HIGHCO: DECLINE IN BUSINESS ACTIVITY IN Q1 2025 (GROSS PROFIT: DOWN 6.4% LFL) AS EXPECTED; 2025 GUIDANCE CONFIRMED
Drop in business in Q1 2025 in line with expectations, with growth in the Activation division in France
Q1 2025 gross profit1 of €15.77 m, down 6.4% LFL2.
Growth in the Activation division driven by France (up 1.4% LFL), rise in Mobile businesses (up 2% LFL) and sharp expected decline in Consulting & In-store media selling due to Casino (down 32.2% LFL).
Electricity has been fully restored across Spain and Portugal following one of the largest power outages in Europe’s recent history, which left nearly 60 million people in the Iberian Peninsula without power on Monday, April 28.
The outage began in the afternoon and stretched into the night, causing widespread chaos across both nations.
Passengers in elevators and public transport were left stranded, with disrupted phone and internet access, leading to the cancellation of hundreds of flights.
According to Spain’s electricity grid operator, Red Eléctrica, the disruption occurred due to two disconnection events in the European power grid, specifically linked to France.
Hosted by World Trade Center Marseille Provence, WTCA's flagship event focused on navigating global trade and connecting leaders with international business opportunities
NEW YORK, April 29, 2025 /PRNewswire/ -- World Trade Centers Association® (WTCA®) — an international trade organization connecting more than 300 World Trade Center® (WTC®) locations in nearly 100 countries and territories — and World Trade Center Marseille Provence have successfully concluded the 55th annual WTCA Global Business Forum (GBF) in Marseille, France.
The four-day event, which took place April 6-9, brought together WTCA members and their global networks, including leaders from business, government, academia, and international organizations.
Each gleaned new insights on shifting global trade dynamics, cross-border real estate investments, the importance of Free Trade Zones (FTZs) and sustainability efforts.
MADRID/LISBON - Power started returning to parts of the Iberian peninsula late on Monday (April 28) after a huge outage brought most of Spain and Portugal to a standstill, grounding planes, halting public transport, and forcing hospitals to suspend routine operations.
Spain's Interior Ministry declared a national emergency, deploying 30,000 police across the country to keep order as governments from the two countries convened emergency cabinet meetings.
Outages on such a scale are extremely rare in Europe.
The cause was unclear, with Portugal suggesting the issue originated in Spain and Spain pointing the finger at a break-up in its connection to France.
MADRID/LISBON: Power started returning to parts of the Iberian peninsula late on Monday after a huge outage brought most of Spain and Portugal to a standstill, grounding planes, halting public transport, and forcing hospitals to suspend routine operations.
Spain’s Interior Ministry declared a national emergency, deploying 30,000 police across the country to keep order as governments from the two countries convened emergency cabinet meetings.
Outages on such a scale are extremely rare in Europe.
The cause was unclear, with Portugal suggesting the issue originated in Spain and Spain pointing the finger at a break-up in its connection to France.
A large-scale power outage brought life to a standstill across Spain, Portugal, and parts of France on Monday, leaving millions without electricity.
The blackout hit major cities including Madrid, Barcelona, Lisbon, Seville, and Valencia, disrupting public transport, air travel, mobile networks, and internet services.
In Spain and Portugal, residents reported widespread mobile network outages and disruptions to internet services.
Trains in Lisbon and Madrid were stuck inside tunnels between stations, forcing passengers to wait in complete darkness.
Companies to build pre-processing facility in northern France to extract 'black mass.
'
Construction to begin in 2026; operations to commence in 2027
LG Energy Solution marks a critical first step toward a closed-loop system in Europe to strengthen value chain competitiveness.
Highco: Q1 2025 Gross Profit
Aix-en-Provence, 29 April 2025 (6 p.m.)
HIGHCO: DECLINE IN BUSINESS ACTIVITY IN Q1 2025 (GROSS PROFIT: DOWN 6.4% LFL) AS EXPECTED; 2025 GUIDANCE CONFIRMED
Drop in business in Q1 2025 in line with expectations, with growth in the Activation division in France
Q1 2025 gross profit1 of €15.77 m, down 6.4% LFL2.
The "France Construction Industry Databook Series Market Size Forecast by Value and Volume, Q1 2025 Update" report has been added to ResearchAndMarkets.com's offering.
The construction market in France is expected to grow by 2.9% on annual basis to reach EUR 161.58 billion in 2025.
The construction market in France experienced robust growth during 2020-2024, achieving a CAGR of 5.9%.
This upward trajectory is expected to continue, with the market forecast to grow at a CAGR of 2.4% during 2025-2029.
The latest news on Spain, Portugal and France.
A massive power outage disrupted Spain, Portugal and parts of France early on Monday, causing significant disruptions in transport, healthcare, and daily life.
The outage, which began around 10:30 GMT, left millions without electricity, paralyzing daily life across the Iberian Peninsula.
Public transportation was halted, with trains and metro systems shut down, while airports across both countries closed their doors.
Europe’s only provider of more powerful, energy-efficient and cost-effective AI Chips than other solutions from global market leaders
Funding will enable VSORA to produce its cutting-edge AI chip in 2025
PARIS, April 29, 2025 (GLOBE NEWSWIRE) -- VSORA, a French innovator and the only European provider of ultra-high-performance artificial intelligence (AI) inference chips, today announced that it has successfully raised $46 million in a new fundraising round.
The investment was led by Otium and a French family office with additional participation from Omnes Capital, Adélie Capital and co-financing from the European Innovation Council (EIC) Fund.
Tens of millions of people across Spain and Portugal have been plunged into a huge power blackout blamed by the Portuguese operator on extreme temperature variations, leaving them without trains, metros, traffic lights, ATMs, phone connections and internet access.
People were trapped in lifts, stuck on trains, stalled in traffic and abandoned in airports.
Hundreds stumbled along pitch-black metro tunnels using their phone torches; others scrambled for basics in supermarkets that could only take cash, or began long trudges home from work.
Mobile networks went down and internet access was cut as power failed at 12.33pm (11.33 BST).