ISLAMABAD: The National Electric Power Regulatory Authority (NEPRA) conducted hearings on K-Electric’s (KE) two utility-scale solar projects—a 150 MW project at Deh Metha Gar and a 120 MW project at Deh Halkani in Sindh.
“These initiatives are part of KE’s ambitious plan to integrate 1,300 MW of renewable energy into its generation portfolio by 2030, aiming to reduce reliance on imported fuels and enhance energy affordability,” the power utility said.
The Deh Metha Gar and Deh Halkani projects secured the lowest tariff bids in Pakistan’s renewable energy sector at PKR 9.8 per unit (approximately 3.4 US cents) from Kot Addu Power Company Limited (KAPCO).
“Projected annual savings of PKR 3.412 billion annually and PKR 86.897 billion over a period of 25 years are expected from these projects. KE submitted auction evaluation reports for both these projects leading to the hearing held on Tuesday.”
, global energy giant BP and state-owned ONGC, which for the first time ever teamed together for any venture, won a
in the latest bid round that saw
walk away with most areas and
winning seven.
is likely to initiate a fresh valuation of its 3,400 telecom towers before inviting new bids from tower asset companies for their sale, said people with direct knowledge of the matter.
The
unit is likely to seek the bids through an open and transparent process in line with Department of Investment and Public Asset Management (Dipam) guidelines and Sebi rules, the people said.
Bharti Hexacom was recently forced to halt plans to sell the wireless communication towers to
New Delhi: The Ministry of Petroleum and Natural Gas signed contracts for 28 blocks awarded under the Open Acreage Licensing Policy (OALP) Bid Round-IX and two blocks under the Special Discovered Small Field (DSF) Round 2024.
The 28 OALP blocks cover a total area of 1,36,596 square kilometres, comprising 13,875.19 sq km in onland areas, 26,648.14 sq km in shallow waters, and 96,073.12 sq km in ultra-deep waters.
Of these, 16 blocks are located in Category-I basins and 12 in Category-II basins.
Out of the total, 23 blocks were carved out through Expressions of Interest (EoI) submitted by operators, while five blocks were delineated by the Directorate General of Hydrocarbons (DGH).
New Delhi: State-run Oil and Natural Gas Corporation (ONGC) has emerged as the biggest winner in the ninth round of the Open Acreage Licensing Policy (OALP), securing 15 of the 28 blocks awarded by the government, including four in partnership.
Private sector player Cairn Oil & Gas, which had submitted bids for all blocks, was awarded seven blocks.
The awarded blocks in OALP Round-IX span 136,596 sq.
km and are distributed across 13,875.19 sq.
onsemi states in a press release that while it still believes that a combination of the companies would have brought two highly complementary businesses together, the company has ultimately determined there is no actionable path forward.
“onsemi is committed to taking a disciplined approach to capital allocation and maximising long-term stockholder value,” said Hassane El-Khoury, president and CEO, onsemi, in the press release.
“While we continue to believe that a combination with onsemi would be beneficial to all stakeholders of both companies, after careful consideration, we have decided to withdraw our acquisition proposal given the reluctance of Allegro’s Board of Directors to fully engage and explore our proposal. We continue to respect both the leadership team at Allegro as well as its talented base of employees.”
onsemi says it will focus on other existing opportunities to enhance stockholder value, and intends to allocate capital towards its existing share repurchase program.
(
- GlobeNewsWire - Nasdaq) VIENNA, Va., April 15, 2025 (GLOBE NEWSWIRE) -- Castellum, Inc. (NYSE-American: CTM) (“Castellum” or“CTM”), a cybersecurity, electronic warfare, and software engineering services company focused on the federal government, announces that its subsidiary Global Technology and Management Resources, Inc. (“GTMR” ) has added Special Item Number (“SIN”) 541611 to their existing General Services Administration (“GSA”) Multiple Award Schedule (“MAS”) contract .
SIN 541611 now allows GTMR to bid on competitive contracts related to management and financial consulting, acquisition and grants management support, and business program and project management services.
GTMR's existing GSA MAS contract includes SIN 541330ENG engineering services, 541380 testing laboratory services, 541420 engineering system design and integration services, and 541715 engineering research and development and strategic planning.
TORONTO, April 15, 2025 (GLOBE NEWSWIRE) -- Onex Corporation (“Onex”) (TSX: ONEX) announced today it has filed with the Toronto Stock Exchange, and the Exchange has accepted, a Notice of Intention to make a Normal Course Issuer Bid permitting Onex to purchase for cancellation up to 10% of the public float in its Subordinate Voting Shares, or 5,779,994 shares.
There are 70,359,895 Subordinate Voting Shares issued and outstanding and the public float as at April 10, 2025 was 57,799,946 shares.
Onex may buy back shares from time to time during the next twelve months.
Any purchases made under the Normal Course Issuer Bid will be effected through the facilities of TSX or alternative Canadian trading systems.
(
- The Rio Times) Mobly, a leading Brazilian online furniture retailer, has received a hostile takeover bid from Regain Participações and Paul Jean Marie Dubrule, a founder of Tok&Stok.
The offer, disclosed in a company filing on April 15, proposes to buy up to 100% of Mobly's shares at R$ 0.68 each.
This price stands 31% below the previous day's closing price of R$ 0.99 and over 95% below Mobly's 2021 IPO price of R$ 21.
ISLAMABAD:Stakeholders from both the government and private sectors have rallied behind K-Electric’s proposed centralized solar energy projects, urging the National Electric Power Regulatory Authority (NEPRA) to expedite tariff approvals.
These projects, which promise significant cost savings and reduced reliance on imported fuels, are seen as crucial for Pakistan’s transition to affordable and sustainable energy.
The endorsement came during a public hearing held by NEPRA to review K-Electric’s Auction Evaluation Reports (AERs) for its 120 MW and 150 MW solar projects in Deh Halkani and Deh Metha Ghar, respectively, both located in Sindh.
These projects are part of KE’s broader 640 MW renewable energy initiative announced earlier in 2024, which also includes 150 MW solar projects in Winder and Bela (Balochistan) and a 220 MW hybrid project in Dhabeji.
Italy-led consortium agree deal to buy Telecom Italia's subsea unit
The Treasury jointly bid with Retelit, a fibre optic operator, which is controlled by Spanish fund Asterion.
Updated On Apr 15, 2025 at 07:35 AM IST
MILAN: A consortium led by the Italian Treasury has reached an agreement to buy
Bharti Hexacom, a subsidiary of Bharti Airtel, is likely to initiate a fresh valuation of its 3,400 telecom towers before inviting new bids from tower infrastructure companies.
The company plans to conduct the sale process in a transparent and competitive manner, adhering to the guidelines laid down by the Department of Investment and Public Asset Management (DIPAM) and regulations of the Securities and Exchange Board of India (SEBI), ETTelecom reported, citing people familiar with the matter.
Also Read: Bharti Hexacom Puts Infrastructure Business Sale to Indus Towers on Hold
TCIL's Objections Halt Previous Deal
The South Orange Village Council on Monday, April 14, passed a resolution awarding a $14.1 million contract with its lowest bidder, Grove Construction LLC, for the renovations of the South Orange Public Library, which has been closed since early 2024 to prepare for construction.
A rendering of what the South Orange Public Library will look like when it is connected to the Connett building next door.
With bids higher than expected for the renovations of the South Orange Public Library, the South Orange Village Council in February voted to appropriate $1 million in supplementary bond money to add to the $16 million already allocated for the total costs.
The project will renovate the empty library space and connect it the historical 1896 Connect building next door, using designs by award-winning New York City architect Andrew Berman, who grew up in South Orange and graduated from Columbia High School.
Merck on Tuesday entered into a nonexclusive licensing and option pact with Austrian biotech Cyprumed in a bid to make its peptide drugs orally available.
Details of the deal were scant.
Merck will pay up to $493 million, a sum inclusive of the upfront fee plus development, regulatory and commercialization milestones of any product that may arise from the partnership.
In exchange for its investment, Merck will gain access to Cyprumed’s proprietary platform to develop novel oral formulations of the pharma’s peptide therapies, though Merck is tight-lipped about specifics.
In a first-of-its-kind three-way partnership, British energy giant BP,
, and state-run ONGC acquired a Gujarat offshore block for exploration of natural gas in the latest bidding round.
The joint venture picked block GS-OSHP-2022/2 in the ninth round of Open Acreage Licensing Policy (OALP-IX) with ONGC as the top overall bidder.
The Open Acreage Licensing Policy permits companies to shortlist and suggest areas for exploration beyond current deepwater blocks.
OALP IX round: ONGC, Cairn take lion's share of oil and gas blocks
OALP IX round: ONGC, Cairn take lion's share of oil and gas blocks
Under the Open Acreage Licensing Policy (OALP) Round-IX, the state-owned firm won 11 blocks on its own and the remaining four with partners, the government announced on Tuesday
State-owned Oil and Natural Gas Corporation (ONGC) and its partners have won the most number of blocks (15) in the ninth round of the national oil and gas asset auctions.
Advait Energy Transitions successfully bids for 11KV MVCC of Amreli Circle of PGVCL
Advait Energy Transitions successfully bids for 11KV MVCC of Amreli Circle of PGVCL
Advait Energy Transitions has received bid confirmation for L1 stage Successful bidder for Turnkey Contract for Supply, Installation, Testing and Commissioning of 11 KV Medium Voltage Covered Conductor (MVCC) with its accessories and allied items for creation of Robust network for reliable power supply in 11KV feeder of Amreli Circle of PGVCL under System Improvement (SI) Scheme to be completed within 12 months.
Powered by Capital Market - Live News