Port Talbot planning approval paves way to achieve decarbonisation goals (opens in a new tab)
A scheme that includes a new 3 million tonne per annum (Mtpa) electric arc furnace at Port Talbot steelworks has gained planning consent following a detailed planning process, including environmental impact assessments (EIA). In September 2023, the UK government and Tata Steel UK Limited (Tata Steel) announced a £1.25 billion joint investment in the development of electric arc furnace-based steelmaking at Port Talbot to replace the coal-fired blast furnaces that have been in operation for more than 50 years. The proposals reflect Tata Steel’s long-term commitment to the production of ‘green’, low-carbon steel at Port Talbot, securing the future of steelmaking in the region and making a significant contribution to the achievement of ambitious Welsh and UK government net zero policies. Data provided in the environmental statement (RSK, 2024) indicate that greenhouse gas emissions avoided with the electric arc furnace compared with the continuation of traditional steelmaking methods are equivalent to nearly 2% of UK and 23% of Wales emissions (2027 equivalent).